{"id":1502,"date":"2021-09-06T09:00:00","date_gmt":"2021-09-06T09:00:00","guid":{"rendered":"https:\/\/www.cyclecheltenham.org.uk\/wp\/?p=1502"},"modified":"2023-02-16T20:06:16","modified_gmt":"2023-02-16T20:06:16","slug":"september-2021-ctcc-committee-meeting","status":"publish","type":"post","link":"https:\/\/www.cyclecheltenham.org.uk\/wp\/september-2021-ctcc-committee-meeting\/","title":{"rendered":"September 2021 C&#038;TCC Committee Meeting"},"content":{"rendered":"\n<p>A small committee group met via Zoom on 6 September, noting absences from several members enjoying much needed holiday breaks.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Cheltenham Spa Station forecourt and Honeybourne line extension<\/h3>\n\n\n\n<p>Committee members continue to attempt to engage with GWR about the safety risks of the delivered scheme for pedestrians and cycle users. Site visits continue to show a number of problems that were highlighted by the campaign during the planning stage;<\/p>\n\n\n\n<ul><li>Pedestrians following the desire line and walking across the taxi rank area<\/li><li>Taxi rank dominating forecourt and blocking buses<\/li><li>Disabled parking area being used for drop off<\/li><li>No continuous cycle route to Honeybourne line meaning route either goes through car park past reversing cars or by ignoring &#8216;cyclist dismount&#8217; signs<\/li><li>Overhanging of vehicles across Honeybourne line extension<\/li><\/ul>\n\n\n\n<p>A meeting was held early in the summer with GWR, but despite changes made to car parking for the benefit of car access, no changes have yet been forthcoming for vulnerable forecourt users. The committee chair has now met with MP Alex Chalk to review the issues and discuss next steps. <\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" loading=\"lazy\" width=\"800\" height=\"600\" src=\"https:\/\/www.cyclecheltenham.org.uk\/wp\/wp-content\/uploads\/2021\/09\/800_600-StationForecourt.jpg\" alt=\"\" class=\"wp-image-1508\"\/><figcaption>Even with a large taxi area across a main pedestrian desire line, vehicles continue conflict with multiple forecourt users, blocking the bus pull in, sight lines to pedestrians exiting the station, and safe access to cycle parking.<\/figcaption><\/figure>\n\n\n\n<p>The committee remain focussed on ensuring GWR deliver on their commitments for the forecourt, recognising the vital role it plays for cycling across Cheltenham.<\/p>\n\n\n\n<p>It was announced last month that Cheltenham Borough Council will accept maintenance responsibility for the Honeybourne Line extension, increasing hopes that the vital connection to the A40 will finally be built. <\/p>\n\n\n\n<p>Early plans suggest there are still areas for the campaign to focus on, particularly the tight turning circle near the top of the proposed ramp, and the poor connectivity at Shelburne Road (which will be the responsibility of Gloucestershire County Council to address).<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" loading=\"lazy\" width=\"800\" height=\"600\" src=\"https:\/\/www.cyclecheltenham.org.uk\/wp\/wp-content\/uploads\/2021\/09\/800_600-Shelburne-Road.jpg\" alt=\"\" class=\"wp-image-1503\"\/><figcaption>The difficult crossing of Shelburne road across fast turning vehicles exiting the A40<\/figcaption><\/figure>\n\n\n\n<p>You can read more <a href=\"https:\/\/www.cyclecheltenham.org.uk\/wp\/honeybourne-line-link-to-a40-lansdown-road-update\/\">here<\/a>.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">A46 Leckhampton<\/h3>\n\n\n\n<p>Despite being a named consultee, Gloucestershire County Council has not yet shared any information with the campaign about proposed changes along the A46 linked to the new Leckhampton Secondary School. However, a public consultation has shared basic information, which outlines what the committee assessed as a highly dangerous proposal, involving narrow shared pavements which will be unsuitable for the intense flows of school-aged children, and junctions that ignore current design standards.<\/p>\n\n\n\n<p>The limited public plans are available <a href=\"https:\/\/www.cyclecheltenham.org.uk\/wp\/wp-content\/uploads\/2021\/09\/kidnappers-lane-sup-consultation-1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">here<\/a>, <a href=\"https:\/\/www.cyclecheltenham.org.uk\/wp\/wp-content\/uploads\/2021\/09\/kidnappers-lane-sup-consultation-2.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">here <\/a>and <a href=\"https:\/\/www.cyclecheltenham.org.uk\/wp\/wp-content\/uploads\/2021\/09\/kidnappers-lane-sup-consultation-3.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">here<\/a>. (from Gloucestershire County Council <a href=\"https:\/\/www.gloucestershire.gov.uk\/highways\/traffic-regulation-orders-tro-and-traffic-schemes\/\" target=\"_blank\" rel=\"noreferrer noopener\">consultation <\/a>pages)<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" loading=\"lazy\" width=\"800\" height=\"600\" src=\"https:\/\/www.cyclecheltenham.org.uk\/wp\/wp-content\/uploads\/2021\/09\/800_600-A46-ShurdingtonRd.jpg\" alt=\"A photo of the A46 showing the traffic mix and inadequate proposed widths for safe cycling\" class=\"wp-image-1504\"\/><figcaption>The pavement proposed to be shared use alongside the A40 for use by school children cycling to Leckhampton School<\/figcaption><\/figure>\n\n\n\n<p>The committee is submitting an outline objection to the scheme, whilst seeking more information on the proposed plans, in the hope of influencing the plans to provide a safe route for future generations.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Arle Court (WCTIS West Cheltenham Transport Improvement Scheme)<\/h3>\n\n\n\n<p>Work continues on this major road scheme, which includes some elements necessary to accommodate the severance and risks of increased traffic to cycle users. Members discussed the disappointing responses to ongoing feedback at key risk points, including the B4063 approach and the crossing to the KFC entrance. Early inspection by the campaign of the new underpass also suggests sight lines will be disappointing for cycle users (as previously highlighted in our response to Gloucestershire County Council).<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Car Free Day and Clean Air Cheltenham<\/h3>\n\n\n\n<p>Clean Air Cheltenham is organising a webinar on 22nd September on what Cheltenham could learn from Nottingham&#8217;s dramatic progress in reducing single occupancy vehicle dependency. The link to booking is <a href=\"https:\/\/www.cleanaircheltenham.org\/workplace-parking-levy-webinar\/\" target=\"_blank\" rel=\"noreferrer noopener\">here<\/a>.<\/p>\n\n\n\n<p>C&amp;TCC members are also hoping to arrange a morning meetup in Cheltenham Town Centre as an opportunity for those choosing to cycle on the day to meet up.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">M5 Overbridge on Bamfurlong Lane<\/h3>\n\n\n\n<p>A committee member highlighted the overbridge across the M5 near Staverton Airport is now listed for replacement by National Highways (Previously Highways England). This is on S<a href=\"https:\/\/www.sustrans.org.uk\/find-a-route-on-the-national-cycle-network\/route-41\" target=\"_blank\" rel=\"noreferrer noopener\">ustrans National Cycle Network 41<\/a>, and the total replacement of the road deck provides an opportunity to create a safe route between the off road path near the police headquarters to the access road to the airport. <\/p>\n\n\n\n<p>Sadly, early correspondence with National Highways suggests that they have decided not to make any provision for safe cycling along this 50mph stretch of road. Ongoing enquiries are being made as to Sustrans position on the proposal, and a committee member is <a href=\"https:\/\/www.whatdotheyknow.com\/request\/decision_not_to_include_cycle_fa#outgoing-1195108\" target=\"_blank\" rel=\"noreferrer noopener\">seeking the assessments made<\/a> in rejecting safe cycling provision. However, at this stage, National Highways appears not to be interested in engaging with local vulnerable road users on this scheme.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Cycling Advisory Group<\/h3>\n\n\n\n<p>Gloucestershire County Council continue to defer reconvening the county&#8217;s cycling advisory group, which would normally be a place for the council to engage with interested local councillors and community groups. The chair of the C&amp;TCC is writing to Colin Chick, to express the importance of these meetings if the council is to understand the communities it is responsible for, and to again offer the campaign&#8217;s expertise to helping the county bring forward proposals that meet the needs of local cycle users, and potential future users.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Annual General Meeting<\/h3>\n\n\n\n<p>The AGM will be held on 11 November, and will be online to allow as many members as possible to attend. A face-to-face social event may also be arranged for those who want to connect in person.<\/p>\n\n\n\n<p>The committee will meet again on 6 October.    <\/p>\n\n\n\n<p> <\/p>\n","protected":false},"excerpt":{"rendered":"<p>A small committee group met via Zoom on 6 September, noting absences from several members enjoying much needed holiday breaks. Cheltenham Spa Station forecourt and Honeybourne line extension Committee members continue to attempt to engage with GWR about the safety risks of the delivered scheme for pedestrians and cycle users. Site visits continue to show&hellip;&nbsp;<a href=\"https:\/\/www.cyclecheltenham.org.uk\/wp\/september-2021-ctcc-committee-meeting\/\" class=\"\" rel=\"bookmark\">Read More &raquo;<span class=\"screen-reader-text\">September 2021 C&#038;TCC Committee Meeting<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":1504,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"neve_meta_sidebar":"","neve_meta_container":"","neve_meta_enable_content_width":"","neve_meta_content_width":0,"neve_meta_title_alignment":"","neve_meta_author_avatar":"","neve_post_elements_order":"","neve_meta_disable_header":"","neve_meta_disable_footer":"","neve_meta_disable_title":"","_themeisle_gutenberg_block_has_review":false,"_ti_tpc_template_sync":false,"_ti_tpc_template_id":""},"categories":[25],"tags":[22],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v20.10 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>September 2021 C&amp;TCC Committee Meeting - Cheltenham &amp; Tewkesbury Cycling Campaign<\/title>\n<meta name=\"description\" content=\"Worrying proposals for the A46 Shurdington Road to access Leckhampton School, ongoing problems at Cheltenham Spa station, WCTIS and Bamfurlong Lane Overbridge M5 works opportunity.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.cyclecheltenham.org.uk\/wp\/september-2021-ctcc-committee-meeting\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"September 2021 C&amp;TCC Committee Meeting - Cheltenham &amp; Tewkesbury Cycling Campaign\" \/>\n<meta property=\"og:description\" content=\"Worrying proposals for the A46 Shurdington Road to access Leckhampton School, ongoing problems at Cheltenham Spa station, WCTIS and Bamfurlong Lane Overbridge M5 works opportunity.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.cyclecheltenham.org.uk\/wp\/september-2021-ctcc-committee-meeting\/\" \/>\n<meta property=\"og:site_name\" content=\"Cheltenham &amp; Tewkesbury Cycling Campaign\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/CycleCheltenham\" \/>\n<meta property=\"article:published_time\" content=\"2021-09-06T09:00:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-02-16T20:06:16+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.cyclecheltenham.org.uk\/wp\/wp-content\/uploads\/2021\/09\/800_600-A46-ShurdingtonRd.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cycleadmin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@CheltTewksCycle\" \/>\n<meta name=\"twitter:site\" content=\"@CheltTewksCycle\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cycleadmin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.cyclecheltenham.org.uk\/wp\/september-2021-ctcc-committee-meeting\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.cyclecheltenham.org.uk\/wp\/september-2021-ctcc-committee-meeting\/\"},\"author\":{\"name\":\"cycleadmin\",\"@id\":\"https:\/\/www.cyclecheltenham.org.uk\/wp\/#\/schema\/person\/93fc3b4aa7fdb6d95aa99ffa360d4eb5\"},\"headline\":\"September 2021 C&#038;TCC Committee Meeting\",\"datePublished\":\"2021-09-06T09:00:00+00:00\",\"dateModified\":\"2023-02-16T20:06:16+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.cyclecheltenham.org.uk\/wp\/september-2021-ctcc-committee-meeting\/\"},\"wordCount\":902,\"publisher\":{\"@id\":\"https:\/\/www.cyclecheltenham.org.uk\/wp\/#organization\"},\"keywords\":[\"Newsfeed\"],\"articleSection\":[\"Campaign news\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.cyclecheltenham.org.uk\/wp\/september-2021-ctcc-committee-meeting\/\",\"url\":\"https:\/\/www.cyclecheltenham.org.uk\/wp\/september-2021-ctcc-committee-meeting\/\",\"name\":\"September 2021 C&TCC Committee Meeting - Cheltenham &amp; Tewkesbury Cycling Campaign\",\"isPartOf\":{\"@id\":\"https:\/\/www.cyclecheltenham.org.uk\/wp\/#website\"},\"datePublished\":\"2021-09-06T09:00:00+00:00\",\"dateModified\":\"2023-02-16T20:06:16+00:00\",\"description\":\"Worrying proposals for the A46 Shurdington Road to access Leckhampton School, ongoing problems at Cheltenham Spa station, WCTIS and Bamfurlong Lane Overbridge M5 works opportunity.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.cyclecheltenham.org.uk\/wp\/september-2021-ctcc-committee-meeting\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.cyclecheltenham.org.uk\/wp\/september-2021-ctcc-committee-meeting\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.cyclecheltenham.org.uk\/wp\/september-2021-ctcc-committee-meeting\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.cyclecheltenham.org.uk\/wp\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"September 2021 C&#038;TCC Committee Meeting\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.cyclecheltenham.org.uk\/wp\/#website\",\"url\":\"https:\/\/www.cyclecheltenham.org.uk\/wp\/\",\"name\":\"Cheltenham &amp; Tewkesbury Cycling Campaign\",\"description\":\"Helping make Cheltenham and Tewkesbury cycle friendly towns where everyone feels able to cycle from their front door to wherever they want to go.\",\"publisher\":{\"@id\":\"https:\/\/www.cyclecheltenham.org.uk\/wp\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.cyclecheltenham.org.uk\/wp\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.cyclecheltenham.org.uk\/wp\/#organization\",\"name\":\"Cheltenham and Tewkesbury Cycle Campaign\",\"alternateName\":\"C&TCC\",\"url\":\"https:\/\/www.cyclecheltenham.org.uk\/wp\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.cyclecheltenham.org.uk\/wp\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.cyclecheltenham.org.uk\/wp\/wp-content\/uploads\/2023\/02\/Logo_rondel.png\",\"contentUrl\":\"https:\/\/www.cyclecheltenham.org.uk\/wp\/wp-content\/uploads\/2023\/02\/Logo_rondel.png\",\"width\":733,\"height\":748,\"caption\":\"Cheltenham and Tewkesbury Cycle Campaign\"},\"image\":{\"@id\":\"https:\/\/www.cyclecheltenham.org.uk\/wp\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/CycleCheltenham\",\"https:\/\/twitter.com\/CheltTewksCycle\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.cyclecheltenham.org.uk\/wp\/#\/schema\/person\/93fc3b4aa7fdb6d95aa99ffa360d4eb5\",\"name\":\"cycleadmin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.cyclecheltenham.org.uk\/wp\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/12d3099450eb565ea3d27d44962a33ad?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/12d3099450eb565ea3d27d44962a33ad?s=96&d=mm&r=g\",\"caption\":\"cycleadmin\"},\"sameAs\":[\"https:\/\/www.cyclecheltenham.org.uk\/wp\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"September 2021 C&TCC Committee Meeting - Cheltenham &amp; Tewkesbury Cycling Campaign","description":"Worrying proposals for the A46 Shurdington Road to access Leckhampton School, ongoing problems at Cheltenham Spa station, WCTIS and Bamfurlong Lane Overbridge M5 works opportunity.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.cyclecheltenham.org.uk\/wp\/september-2021-ctcc-committee-meeting\/","og_locale":"en_GB","og_type":"article","og_title":"September 2021 C&TCC Committee Meeting - Cheltenham &amp; Tewkesbury Cycling Campaign","og_description":"Worrying proposals for the A46 Shurdington Road to access Leckhampton School, ongoing problems at Cheltenham Spa station, WCTIS and Bamfurlong Lane Overbridge M5 works opportunity.","og_url":"https:\/\/www.cyclecheltenham.org.uk\/wp\/september-2021-ctcc-committee-meeting\/","og_site_name":"Cheltenham &amp; Tewkesbury Cycling Campaign","article_publisher":"https:\/\/www.facebook.com\/CycleCheltenham","article_published_time":"2021-09-06T09:00:00+00:00","article_modified_time":"2023-02-16T20:06:16+00:00","og_image":[{"width":800,"height":600,"url":"https:\/\/www.cyclecheltenham.org.uk\/wp\/wp-content\/uploads\/2021\/09\/800_600-A46-ShurdingtonRd.jpg","type":"image\/jpeg"}],"author":"cycleadmin","twitter_card":"summary_large_image","twitter_creator":"@CheltTewksCycle","twitter_site":"@CheltTewksCycle","twitter_misc":{"Written by":"cycleadmin","Estimated reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.cyclecheltenham.org.uk\/wp\/september-2021-ctcc-committee-meeting\/#article","isPartOf":{"@id":"https:\/\/www.cyclecheltenham.org.uk\/wp\/september-2021-ctcc-committee-meeting\/"},"author":{"name":"cycleadmin","@id":"https:\/\/www.cyclecheltenham.org.uk\/wp\/#\/schema\/person\/93fc3b4aa7fdb6d95aa99ffa360d4eb5"},"headline":"September 2021 C&#038;TCC Committee Meeting","datePublished":"2021-09-06T09:00:00+00:00","dateModified":"2023-02-16T20:06:16+00:00","mainEntityOfPage":{"@id":"https:\/\/www.cyclecheltenham.org.uk\/wp\/september-2021-ctcc-committee-meeting\/"},"wordCount":902,"publisher":{"@id":"https:\/\/www.cyclecheltenham.org.uk\/wp\/#organization"},"keywords":["Newsfeed"],"articleSection":["Campaign news"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/www.cyclecheltenham.org.uk\/wp\/september-2021-ctcc-committee-meeting\/","url":"https:\/\/www.cyclecheltenham.org.uk\/wp\/september-2021-ctcc-committee-meeting\/","name":"September 2021 C&TCC Committee Meeting - Cheltenham &amp; Tewkesbury Cycling Campaign","isPartOf":{"@id":"https:\/\/www.cyclecheltenham.org.uk\/wp\/#website"},"datePublished":"2021-09-06T09:00:00+00:00","dateModified":"2023-02-16T20:06:16+00:00","description":"Worrying proposals for the A46 Shurdington Road to access Leckhampton School, ongoing problems at Cheltenham Spa station, WCTIS and Bamfurlong Lane Overbridge M5 works opportunity.","breadcrumb":{"@id":"https:\/\/www.cyclecheltenham.org.uk\/wp\/september-2021-ctcc-committee-meeting\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.cyclecheltenham.org.uk\/wp\/september-2021-ctcc-committee-meeting\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.cyclecheltenham.org.uk\/wp\/september-2021-ctcc-committee-meeting\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.cyclecheltenham.org.uk\/wp\/"},{"@type":"ListItem","position":2,"name":"September 2021 C&#038;TCC Committee Meeting"}]},{"@type":"WebSite","@id":"https:\/\/www.cyclecheltenham.org.uk\/wp\/#website","url":"https:\/\/www.cyclecheltenham.org.uk\/wp\/","name":"Cheltenham &amp; Tewkesbury Cycling Campaign","description":"Helping make Cheltenham and Tewkesbury cycle friendly towns where everyone feels able to cycle from their front door to wherever they want to go.","publisher":{"@id":"https:\/\/www.cyclecheltenham.org.uk\/wp\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.cyclecheltenham.org.uk\/wp\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/www.cyclecheltenham.org.uk\/wp\/#organization","name":"Cheltenham and Tewkesbury Cycle Campaign","alternateName":"C&TCC","url":"https:\/\/www.cyclecheltenham.org.uk\/wp\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.cyclecheltenham.org.uk\/wp\/#\/schema\/logo\/image\/","url":"https:\/\/www.cyclecheltenham.org.uk\/wp\/wp-content\/uploads\/2023\/02\/Logo_rondel.png","contentUrl":"https:\/\/www.cyclecheltenham.org.uk\/wp\/wp-content\/uploads\/2023\/02\/Logo_rondel.png","width":733,"height":748,"caption":"Cheltenham and Tewkesbury Cycle Campaign"},"image":{"@id":"https:\/\/www.cyclecheltenham.org.uk\/wp\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/CycleCheltenham","https:\/\/twitter.com\/CheltTewksCycle"]},{"@type":"Person","@id":"https:\/\/www.cyclecheltenham.org.uk\/wp\/#\/schema\/person\/93fc3b4aa7fdb6d95aa99ffa360d4eb5","name":"cycleadmin","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.cyclecheltenham.org.uk\/wp\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/12d3099450eb565ea3d27d44962a33ad?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/12d3099450eb565ea3d27d44962a33ad?s=96&d=mm&r=g","caption":"cycleadmin"},"sameAs":["https:\/\/www.cyclecheltenham.org.uk\/wp"]}]}},"rttpg_featured_image_url":{"full":["https:\/\/www.cyclecheltenham.org.uk\/wp\/wp-content\/uploads\/2021\/09\/800_600-A46-ShurdingtonRd.jpg",800,600,false],"landscape":["https:\/\/www.cyclecheltenham.org.uk\/wp\/wp-content\/uploads\/2021\/09\/800_600-A46-ShurdingtonRd.jpg",800,600,false],"portraits":["https:\/\/www.cyclecheltenham.org.uk\/wp\/wp-content\/uploads\/2021\/09\/800_600-A46-ShurdingtonRd.jpg",800,600,false],"thumbnail":["https:\/\/www.cyclecheltenham.org.uk\/wp\/wp-content\/uploads\/2021\/09\/800_600-A46-ShurdingtonRd-150x150.jpg",150,150,true],"medium":["https:\/\/www.cyclecheltenham.org.uk\/wp\/wp-content\/uploads\/2021\/09\/800_600-A46-ShurdingtonRd-300x225.jpg",300,225,true],"large":["https:\/\/www.cyclecheltenham.org.uk\/wp\/wp-content\/uploads\/2021\/09\/800_600-A46-ShurdingtonRd.jpg",800,600,false],"1536x1536":["https:\/\/www.cyclecheltenham.org.uk\/wp\/wp-content\/uploads\/2021\/09\/800_600-A46-ShurdingtonRd.jpg",800,600,false],"2048x2048":["https:\/\/www.cyclecheltenham.org.uk\/wp\/wp-content\/uploads\/2021\/09\/800_600-A46-ShurdingtonRd.jpg",800,600,false],"neve-blog":["https:\/\/www.cyclecheltenham.org.uk\/wp\/wp-content\/uploads\/2021\/09\/800_600-A46-ShurdingtonRd.jpg",800,600,false]},"rttpg_author":{"display_name":"cycleadmin","author_link":"https:\/\/www.cyclecheltenham.org.uk\/wp\/author\/cycleadmin\/"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/www.cyclecheltenham.org.uk\/wp\/category\/updates\/campaign-news\/\" rel=\"category tag\">Campaign news<\/a>","rttpg_excerpt":"A small committee group met via Zoom on 6 September, noting absences from several members enjoying much needed holiday breaks. Cheltenham Spa Station forecourt and Honeybourne line extension Committee members continue to attempt to engage with GWR about the safety risks of the delivered scheme for pedestrians and cycle users. Site visits continue to show&hellip;&nbsp;Read&hellip;","_links":{"self":[{"href":"https:\/\/www.cyclecheltenham.org.uk\/wp\/wp-json\/wp\/v2\/posts\/1502"}],"collection":[{"href":"https:\/\/www.cyclecheltenham.org.uk\/wp\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cyclecheltenham.org.uk\/wp\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cyclecheltenham.org.uk\/wp\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cyclecheltenham.org.uk\/wp\/wp-json\/wp\/v2\/comments?post=1502"}],"version-history":[{"count":0,"href":"https:\/\/www.cyclecheltenham.org.uk\/wp\/wp-json\/wp\/v2\/posts\/1502\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.cyclecheltenham.org.uk\/wp\/wp-json\/wp\/v2\/media\/1504"}],"wp:attachment":[{"href":"https:\/\/www.cyclecheltenham.org.uk\/wp\/wp-json\/wp\/v2\/media?parent=1502"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cyclecheltenham.org.uk\/wp\/wp-json\/wp\/v2\/categories?post=1502"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cyclecheltenham.org.uk\/wp\/wp-json\/wp\/v2\/tags?post=1502"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}